Home Site map Font unicode Tiếng việt

 NEWS Economic News

FENCE TO BE ERECTED TO SAFEGUARD THE DUNG QUAT PIPELINE (15/05/2008)

 
Dung Quat pipeline

A source from Dung Quat Refinery PMB says Vietnam Oil and Gas Group (PetroVietnam) has decided to allocate some VND 40 billion to construct a safeguard fence to ensure security for the 7km-long pipeline that carry the refined oil and othet petroleum-based products from the refinery to the petroleum port.

 

The fence shall be constructed along the both sides of the pipeline, consisting of reinforced concrete piles, 2.5 m high, interconnected with metal net. A 7.5 km long lighting system shall also be intalled for security purpose.

 

The country’s first ever oil refinery of Dung Quat, now under accelerating construction, is scheduled to be operational by February 2009.

 

M.T

  

 

 Other news :

. From rags to riches (13/05/2008)

. Quang Ngai: 4-month revenue increase 4.3% (25/04/2008)

. Export turnover up 16.7% (23/04/2008)

. Quang Ngai 1.3 billion dong for Summer-Autumn Crop (22/04/2008)

. First quarter: Quang Ngai grossed VND 24 bln from tourism (18/04/2008)

. SPM SUCCESFULLY LAUNCHED (11/04/2008)

. District Industrial zones assisted 40-50% (09/04/2008)

. Japan, Viet Nam speed up EPA talks (09/04/2008)

. QUANG NGAI ATM INTERCONNECTED (03/04/2008)

. ADB lowers growth forecast for Vietnam (03/04/2008)

 

  Site visited:1199022

Copyright© by The people's committee of Quang Ngai province.
Designed by Softech Danang