PORT SYSTEM
Dung Quat port complex is planned to include a port for tankers of 80,000-110,000DWT at Viet Thanh bay, a general port with able to receive 50,000DWT ships on the left bank of the Dap river, and specialized ports for shipbuilding and steel factories. Beside, a container terminal will be built inside the Dung Quat economic zone for serving large ships of 100,000-150,000DWT.
The complex port is designed to have an annual throughput of 20 million tons of cargo by 2010 and 34 million tons by 2020.
I. Operation ports:
1.

Put in operation early May 2009,
2.

3.
.jpg)
The port is invested and built by Doosan Heavy Industry and Construction Co., Ltd serving the complex’s im-export activities and is located in Dung Quat Economic Zone.
5.

Port’s location is in Dinh Tan hamlet, Binh Chau, Binh Son, Quang Ngai. Maximum size of vessel accepted : 1.000DWT. Main services: Cargo handling, bagging, tallying warehousing, transporting, and other marine services.
II. Orient
Quang Ngai Government plans to build Dung Quat Port No.2 in Dung Quat Economic Zone for the sake of heavy industry. The Port No.2 shall be dedicated for those industries of refining, petrochemical, building ship, making steel and heavy equipments.
So far, over 25 positions in the zone have been surveyed, of which My Han Bay is said to be deep enough to welcome vessels 250,000- 300,000 DWT.
- Events
- QNgai's re-establishment ( 07/1989 – 07/2009 )
- Sa Huynh Culture
- Dung Quat Refinery
- Administrative Bodies
- People's Council
- People's Committee
- Departments
- Districts
- Agencies
- INGOs in Quang Ngai
- Overview
- Population
- Quang Ngai history
- Investment
- Culture
- Tourism
- Hotels
- Restaurants
- Places of amusement
- Travel agencies
- Food specialities
- Traveling in Quang Ngai
- Shopping